Since she was bought in March 2024, Annika has operated day and night all around the Baltic Sea contributing to a safe and efficient transportation chain. Drydocked in November 2024 where she underwent paint jobs and a 35 year class survey, self-discharging excavator planned on being installed under 2025.
Annika arriving Mariehamn to load energywood
Annika drydocked in Naantali 2024
Annika loaded with 4 pcs of Wärtsilä 6L34DF